BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20180510T230000Z
DTEND:20180511T010000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:2nd Public Meeting on Future of Evergreen Lake North Trail
DESCRIPTION:Evergreen Park & Recreation District (EPRD) invites residents to attend a public meeting on Thursday\, May 10\, 2018\, to discuss its vision for the future of the Evergreen Lake North Trail. Conceptual alternative solutions will be presented and the public will have an opportunity to provide feedback.\n\n\n\nThe meeting will be held from 5-7 PM at Buchanan Park Recreation Center (Bergen Peak Room)\, 32003 Ellingwood Trail\, Evergreen\, CO 80439.\n\n\n\nThe trail section between Upper Bear Creek Road and the Evergreen Dam along Highway 74 was reopened last Nov. 30 after being closed for more than a year and a half due to instability\, but the short-term fix is not expected to last beyond five years\, said Ellen O'Connor\, EPRD's Executive Director.\n\n\n\nEPRD and the Metro District worked together for several months to do temporary maintenance and repairs to the closed section\, shoring up the wall and trail system so that it could reopen in a safe condition until a funded project to replace them can be established. The repair work included replacement of two sections of failed wall\, work on other areas of the existing wall\, and maintenance and repair of the handrail system and trail surface.\n\n\n\nThe District has been working with OV Consulting\, a trail project consultant\, on the Evergreen Lake North Trail Project\, a planning study seeking to develop long-term options for the trail that will accommodate the mountain community's growing population and diverse users.\n\n\n\nThe project was launched in response to the spring 2016 closure of 1\,200 feet of the trail\, which is located on property owned by the City and County of Denver and managed\, through intergovernmental agreements\, by EPRD. \n\n\n\nAt January's first Public Meeting\, EPRD and OV Consulting provided background about the trail\, including what happened to force its closure\, what has been going on since then\, what the District has done to improve the trail\, and plans for the future. The District also discussed its vision for the trail's future\, present long-term alternatives and solicited community input. \n\n\n\nFor more information about the trail\, contact Chris Vogelsang\, Principal-Engineer for OV Consulting\, chris@ovllc.com or 303-898-8042.
X-ALT-DESC;FMTTYPE=text/html:<span style="color:rgb(75\, 79\, 86)\; font-family:helvetica\,arial\,sans-serif\; font-size:14px">Evergreen Park &amp\; Recreation District (EPRD) invites residents to attend a public meeting on Thursday\, May 10\,&nbsp\;2018\, to discuss its vision for the future of the Evergreen Lake North Trail. Conceptual alternative solutions will be presented and the public will have an opportunity to provide feedback.</span><br />\n<br />\n<span style="color:rgb(75\, 79\, 86)\; font-family:helvetica\,arial\,sans-serif\; font-size:14px">The meeting will be held from 5-7 PM at Buchanan Park Recreation Center (Bergen Peak Room)\,&nbsp\;<a href="https://goo.gl/maps/ubtKPHwBshp">32003 Ellingwood Trail\, Evergreen\, CO 80439</a></span><span style="color:rgb(75\, 79\, 86)\; font-family:helvetica\,arial\,sans-serif\; font-size:14px">.</span><br />\n<br />\n<span style="color:rgb(75\, 79\, 86)\; font-family:helvetica\,arial\,sans-serif\; font-size:14px">The trail section between Upper Bear Creek Road and the Evergreen Dam along Highway 74 was reopened last Nov. 30 after being closed for more than a year and a half due to instability\, but the short-term fix is not expected to last beyond five years\, said El</span><span style="color:rgb(75\, 79\, 86)\; font-family:helvetica\,arial\,sans-serif\; font-size:14px">len O&rsquo\;Connor\, EPRD&rsquo\;s Executive Director.<br />\n<br />\nEPRD and the Metro District worked together for several months to do temporary maintenance and repairs to the closed section\, shoring up the wall and trail system so that it could reopen in a safe condition until a funded project to replace them can be established. The repair work included replacement of two sections of failed wall\, work on other areas of the existing wall\, and maintenance and repair of the handrail system and trail surface.<br />\n<br />\nThe District has been working with OV Consulting\, a trail project consultant\, on the Evergreen Lake North Trail Project\, a planning study seeking to develop long-term options for the trail that will accommodate the mountain community&rsquo\;s growing population and diverse users.<br />\n<br />\nThe project was launched in response to the spring 2016 closure of 1\,200 feet of the trail\, which is located on property owned by the City and County of Denver and managed\, through intergovernmental agreements\, by EPRD.&nbsp\;<br />\n<br />\nAt January&rsquo\;s first Public Meeting\, EPRD and OV Consulting provided background about the trail\, including what happened to force its closure\, what has been going on since then\, what the District has done to improve the&nbsp\;trail\,&nbsp\;and plans for the future. The District also discussed its vision for the trail&rsquo\;s future\, present long-term alternatives and solicited community input.&nbsp\;<br />\n<br />\nFor more information about the trail\, contact Chris Vogelsang\, Principal-Engineer for OV Consulting\,&nbsp\;<a href="mailto:chris@ovllc.com">chris@ovllc.com</a>&nbsp\;or 303-898-8042.</span>
LOCATION:Buchanan Park Recreation Center (Bergen Peak Room)\, 32003 Ellingwood Trail\, Evergreen\, CO 80439
UID:e.692.25799
SEQUENCE:3
DTSTAMP:20260410T080702Z
URL:https://business.goconifer.com/events/details/2nd-public-meeting-on-future-of-evergreen-lake-north-trail-25799
END:VEVENT

END:VCALENDAR
